A summer with the taps off.
Dry traps.
The usual September problem.

Irish schools close at the end of June and reopen in late August. A trap that goes unused for two to four weeks loses its water seal, so over a full summer closure every trap in the building is dry. Back-to-school week then brings sewer odours through the corridors, drain flies in the kitchen and a queue of calls to the caretaker. Green Drain™ deals with the cause.

No chemicalsNothing to serviceFits in seconds~5-year expected life
2–4 weeks
And an unused trap has lost its seal
~3,100
Primary schools in Ireland
0
Chemicals required
~5 years
Expected service life
Problem & solution

What happens in a school over the summer.

No pupils, no kitchen, no one using the toilets. A trap left unused for two to four weeks loses its water seal, so by the end of a summer closure every trap in the building is dry. Odours build, flies breed in the biofilm, and it is all waiting for staff and pupils on the first morning back.

Without Green Drain™

  • Traps in every toilet block have lost their seal well before the schools reopen.
  • Fruit flies and drain flies (Drosophila, Psychoda) breed undisturbed in the biofilm.
  • The kitchen opens ahead of term and the staff walk into flies and odour.
  • Complaints from parents about the smell in the toilets, in the first week back.
  • The caretaker has to flush every drain by hand before term starts — a real labour cost.

With Green Drain™

  • A passive barrier that seals whether the drain is wet or bone dry.
  • No chemicals and no water top-up — suitable around children.
  • Nothing to service, with an expected service life of about five years.
  • Stands up to normal school cleaning agents — chlorine, soaps and floor cleaners.
  • Quiet in use, with no gurgling from the drain even at full flow.
Irish School Network

Verified figures from the Department of Education.

Ireland has roughly 3,100 primary schools and around 720 post-primary schools recognised by the Department of Education (2024/25), alongside the ETB sector and a steady programme of new-build campuses. Every one of them closes for the summer, and for mid-terms and bank holidays as well. A trap that goes two to four weeks without water loses its seal, and the building reopens with sewer odour and drain flies in the toilet blocks, kitchen and changing rooms.

~3,100
Primary schools (Department of Education, 2024/25)
~720
Post-primary schools (Department of Education, 2024/25)
Universities
Plus the technological university sector — see our universities page
2–4 weeks
An unused trap loses its water seal
0
Chemicals — safe for children and students
DIY
30 seconds per drain, no tools required
Data Sources and Regulatory Framework (2024–2025 data)

Statistical data taken from official Irish and EU sources: Central Statistics Office Ireland (cso.ie), Health Service Executive (hse.ie), Fáilte Ireland (failteireland.ie), Bord Bia (bordbia.ie), IDA Ireland (idaireland.com), Health Products Regulatory Authority (hpra.ie). Regulatory framework: EUR-Lex for EU directives — EU 2017/745 (MDR), EU 178/2002 (food safety), EU 1935/2004 and EU 10/2011 (food contact materials), EU 528/2012 (BPR), EU 2014/34 (ATEX). Standards: EN 1253-1 (floor P-traps, water seal ≥50 mm), EN 1253 Parts 6/7/8 (gullies with a water seal below 50 mm, with mechanical closure, and combined types; 2023 editions), HACCP International RG-04, ASSE 1072-2020, NSF/ANSI 2, HSE SARI guidelines. Revision date: May 2026.

Implementation

The whole school in one afternoon.

Ideally: the end of August, before classes start. A typical school — half a day's work for one technician.

01

Audit

The technician maps all drains throughout the facility — classrooms, toilets, kitchen and sports hall.

02

Offer

A written proposal for the principal and the maintenance team, covering boarding accommodation where there is any.

03

Test

We fit three samples at the critical points and your maintenance team judges the result.

04

The whole school

Half a day's work, carried out in the week before term starts.

Model Recommendation

Recommended sizes by type of room.

Irish schools are built to EN 1253. Most primary schools built after 2000 have DN50 P-traps in washrooms. Older buildings have a mix of DN65/80. Sports halls always have larger traps (DN80–100) for shared shower facilities.

Green Drain™ Recommended for your industry.

  • Primary school washrooms (new build)GD 2The most common size in Irish schools.
  • Shower rooms in sports hallsGD 3 (primary schools) or GD 3.5 (medium-sized with two halls)
  • School kitchen (meal preparation)GD 4Standard for kitchens producing 200–500 meals a day.
  • Dormitories (rooms + shared bathrooms)GD 2 or GD 3Closed all summer — the seal still holds.
💬 Not sure of the exact size? Send us a photo of your sink drain — our technical team will respond with a written recommendation within the same business day, free of charge.
Check out Green Drain™ → Request a quote
GD 2
DN50 · toilet blocks, crèches
GD 2.5
DN65 · older converted buildings
GD 3
DN80 · standard shower rooms
GD 3.5
DN90 · large shower rooms
GD 4
DN100 · kitchens, dormitories
GD 6
DN150 · central drain
Complete solution

Three products.
One protection portfolio.

Green Drain™ doesn't work alone — for maximum drain control it's combined with GD Uri-Tabs™ (urinals) and GreenSwirl™ (drain unblocking).

Ready for Free audit?

We come to the site, map the drains, and provide a written recommendation — no cost, no obligation.